Installation Procedure
 
A) Dry and level up the ground before the installation.
B) The anti-moisture pad is needed, to aovid the flooring getting wet.
C) Need 1 cm space at the edge of the flooring to the wall for the contraction.
 
1 2
   
1 Install the 1st row of flooring,
from right to the left.
2 Insert the flooring
       with 45 degree angle.
   
3 4
   
3 Tongue side to agaist groove side, using a wood hammer punch it lightly until the flooring closed tight. 4 Put together the tongue and groove sides tightly according to the picture.
   
5  
   
5 Same way as stated in 3.  
 
 